Knowledge library

Solar knowledge for businesses

Practical guides grounded in current regulation and project delivery experience: rooftop self-consumption rules, the zero-capex ESCO model, EPC scope, cost and payback analysis, and battery storage.

01 · Solar knowledge

Commercial rooftop solar in Vietnam: rules and delivery

A complete guide to industrial rooftop solar in Vietnam: self-production and self-consumption rules under Decree 58/2025/ND-CP, sizing against the load curve, realistic yields and the EPC delivery process.

  • · Why rooftop solar fits industrial sites
  • · Current rules: self-production and self-consumption under Decree 58/2025/ND-CP
  • · Size the system against the load, not the roof area
Solar knowledge →

02 · Investment models

Zero-capex solar (ESCO): how the model works

How the solar ESCO model works: an investor funds the rooftop system, the company buys on-site power below the grid tariff. Eligibility, contract structure, risks and the clauses to negotiate.

  • · How the ESCO structure works
  • · What makes a site bankable for an ESCO investor
  • · Clauses that deserve careful negotiation
Investment models →

03 · EPC services

Solar EPC: scope of work and how to select a contractor

What a solar EPC contractor delivers: the E–P–C scope, the process from survey to commissioning and O&M, selection criteria and the contract risks that matter most.

  • · The E – P – C scope in a solar project
  • · Standard delivery process
  • · How to assess contractor capability
EPC services →

04 · Investment analysis

Solar investment cost and how to calculate payback

The cost structure of a rooftop solar project, what moves the cost per kWp, and how to calculate payback and levelised cost of electricity (LCOE) from simulated yield and grid tariffs.

  • · Cost structure of a rooftop project
  • · What moves the cost per kWp
  • · Calculating payback and LCOE
Investment analysis →

05 · Energy storage

BESS for industrial users: applications and sizing

What BESS does in a factory: peak shaving, shifting solar generation, backup during outages and supporting power purchase contracts. How to size power and energy, choose cell technology and meet safety requirements.

  • · Four core applications in industrial sites
  • · Sizing power (MW) and energy (MWh) separately
  • · Cell technology and safety
Energy storage →

06 · Working principle

How does solar power work?

Animated explanation of how solar power is generated: the photovoltaic effect inside the cell, DC current from the modules, the inverter converting DC to grid-synchronous AC, how energy reaches on-site loads and the grid, and what drives real yield.

  • · Step 1 – The photovoltaic effect inside the cell
  • · Step 2 – From module DC to grid AC through the inverter
  • · Step 3 – What a complete solar system contains
Working principle →

07 · Electrical basics

Single-phase vs three-phase: what is the difference?

Animated comparison of single-phase and three-phase supply: 220 V versus 380 V in Vietnam, conductor count, suitable capacity, how to choose a single- or three-phase inverter, and phase imbalance issues when connecting solar.

  • · What single-phase and three-phase supply mean
  • · Key differences at a glance
  • · Choosing a single-phase or three-phase inverter
Electrical basics →

08 · Equipment selection

Which solar brand should you choose?

How to select solar equipment brands on verifiable criteria: IEC certification, efficiency, warranty terms, degradation and local service. Why Orca Energy favours JA Solar modules and Sungrow inverters on commercial rooftop projects in Vietnam.

  • · Module criteria: read the datasheet, not the brochure
  • · Inverter criteria: the component that decides uptime
  • · Why Orca Energy favours JA Solar modules
Equipment selection →

11 · Operations & maintenance

Solar O&M: what to do and how often

A practical guide to operating and maintaining rooftop solar: monthly, quarterly and annual task lists, tracking performance ratio, finding faulty modules with thermography, and the KPIs worth putting in an O&M contract.

  • · Task list by frequency
  • · Tracking performance with performance ratio
  • · Common faults on rooftop systems
Operations & maintenance →

12 · Equipment

Which inverter type fits your solar project?

Comparison of solar inverter types – string, central, hybrid and micro-inverters: operating principle, pros and cons, the datasheet parameters that matter, and how to choose by project size and roof geometry.

  • · Four inverter families
  • · Datasheet parameters that matter
  • · Choosing by size and roof geometry
Equipment →

13 · Industrial parks

Solar for industrial parks: how to do it properly

How to deliver solar inside an industrial park: rooftop solar on leased factory buildings, ESCO models across multiple tenants, agreements with the park infrastructure owner, permitting and fire safety, plus renewable supply through DPPA.

  • · Three common delivery models
  • · Points to settle with the roof and park owner
  • · Permitting, safety and fire protection
Industrial parks →

14 · Permitting

Grid connection for rooftop solar: process and documents

The connection agreement process for self-consumption rooftop solar with the Vietnamese utility: preparation steps, the technical documents to have ready, commissioning, and the mistakes that get applications sent back.

  • · The legal basis to read first
  • · Typical process
  • · Technical documents to prepare
Permitting →

15 · Policy

Rooftop solar policy in Vietnam: Directive 10/CT-TTg and MOIT guidance

What Directive 10/CT-TTg and Official Letter 7404/BCT-DL say about electricity saving and self-production, self-consumption rooftop solar: targets, priority groups, deadlines and what it means for factories.

  • · Saving targets and installation ratios in Directive 10/CT-TTg
  • · Official Letter 7404/BCT-DL: MOIT pushes provinces to act
  • · What this means for factories and commercial buildings
Policy →

16 · Procedure

Rooftop solar procedure under Decree 58/2025 in Vietnam

How to install self-production, self-consumption rooftop solar in Vietnam under Decree 58/2025/ND-CP: building conditions, notification versus development registration, grid connection and the rules on surplus electricity.

  • · Building conditions before installation
  • · Notification or development registration: pick the right route
  • · Surplus electricity and export limits
Procedure →

17 · Policy

Support for households installing rooftop solar and storage

What is already in force under Decree 58/2025 for household self-consumption rooftop solar, what remains a draft decision at MOIT, and how a household should calculate real savings.

  • · What is already in force
  • · Still a draft: the household support decision
  • · How to calculate household economics
Policy →

This guide compiles reference information from legal documents and official sources; it is not legal advice. Technical and financial ranges are industry reference values — project decisions require a site-specific survey.

Want to know how much power your factory roof could generate?

Want to know how much power your factory roof could generate?

Send us your last three electricity bills and Orca Energy will calculate generation, savings and the right investment option — free of charge.