How much does a 100 kWp solar system cost, and how fast does it pay back?
Investment cost
100 kWp is the most common size for mid-sized factories, warehouses and commercial buildings: it matches daytime load without demanding an unusually large roof. This guide breaks down what makes up the capex, the output you can expect in Vietnam, and the variables that decide payback.
In this guide
01
What the capex per kWp actually covers
Rooftop solar is usually quoted as a capex per kWp. That figure is far more than modules and inverters: electrical materials, mounting structure, installation and permitting take a meaningful share, and most of the spread between quotations sits there.
- PV modules and inverters – typically the two largest equipment items.
- Mounting structure, clamps, corrosion protection and waterproofing at every roof penetration.
- Electrical balance of system: DC/AC cabling, switchboards, protection devices, surge protection, earthing, metering.
- Installation, testing and commissioning, monitoring platform, permitting and grid connection paperwork.
Capex varies with roof type, working height, equipment brands and material prices at purchase time; a firm number only exists after a site survey.
02
How much energy a 100 kWp system generates per year
Output follows local irradiation. Based on reference irradiation data (Global Solar Atlas), specific yield for rooftop systems in Vietnam typically falls in the range of about 1,100–1,550 kWh/kWp/year, increasing from the north towards the south-central, Central Highlands and southern regions.
- Northern Vietnam: roughly 1,100–1,200 kWh/kWp/year, i.e. about 110,000–120,000 kWh/year for 100 kWp.
- North-central to central coast: roughly 1,300–1,400 kWh/kWp/year.
- South-central coast and Central Highlands: roughly 1,500–1,600 kWh/kWp/year.
- Southern Vietnam: roughly 1,400–1,500 kWh/kWp/year.
These are reference ranges for a preliminary case. Design yield must be simulated for the actual coordinates, roof orientation, tilt, shading and equipment.
03
How the electricity savings are calculated
The real value sits in self-consumed energy: every kWh generated and used on site replaces one kWh bought from the grid at the commercial and industrial retail tariff. So the two decisive variables are the self-consumption ratio and the blended tariff you currently pay.
- First-year savings ≈ annual yield × self-consumption ratio × blended tariff from your bills.
- Self-consumption is high (85–100%) when the plant runs in daylight all week, and lower with weekend shutdowns or night shifts.
- Surplus export is only allowed within the limits and at the price defined by Decree 58/2025/ND-CP, so it should not be treated as a primary revenue stream.
- Output declines slightly each year through module degradation (commonly published around 0.4–0.55%/year depending on the product line).
04
Payback period and how to shorten it
Simple payback is total capex divided by annual savings. At the same capex, a project in a high-irradiation region with near-100% self-consumption pays back considerably faster than one exporting a large share of its output.
- Size the system to the daytime load curve instead of covering the whole roof.
- Prioritise unshaded roof areas with favourable orientation and tilt to raise specific yield.
- If you prefer no capex, use the ESCO model: an investor installs the system and sells power below the grid tariff.
- Run a quick estimate from your own bill using the Orca Energy capacity, yield and payback calculator.
Frequently asked questions
How much roof area does 100 kWp need?
With today's high-power modules each kWp needs roughly 5–6 m² of usable roof, so 100 kWp needs about 500–600 m², before maintenance walkways and the safety setbacks required by fire protection rules.
Should we oversize beyond our load to sell surplus power?
Generally no. Decree 58/2025/ND-CP caps the surplus that may be sold at no more than 20% of the energy generated at the source output and sets the applicable price, so capacity beyond your load usually lengthens payback.
What are the annual operating costs?
O&M covers module cleaning, thermographic inspection, torque checks, switchboard maintenance and performance monitoring; it is usually quoted as a small share of capex per year or as an annual service package depending on size and location.
Related guides
Investment analysis
Solar investment cost and how to calculate payback
The cost structure of a rooftop solar project, what moves the cost per kWp, and how to calculate payback and levelised cost of electricity (LCOE) from simulated yield and grid tariffs.
Solar knowledge
Commercial rooftop solar in Vietnam: rules and delivery
A complete guide to industrial rooftop solar in Vietnam: self-production and self-consumption rules under Decree 58/2025/ND-CP, sizing against the load curve, realistic yields and the EPC delivery process.
Investment models
Zero-capex solar (ESCO): how the model works
How the solar ESCO model works: an investor funds the rooftop system, the company buys on-site power below the grid tariff. Eligibility, contract structure, risks and the clauses to negotiate.
Operations & maintenance
Solar O&M: what to do and how often
A practical guide to operating and maintaining rooftop solar: monthly, quarterly and annual task lists, tracking performance ratio, finding faulty modules with thermography, and the KPIs worth putting in an O&M contract.
Sources
- Decree 58/2025/ND-CP on renewable energy development – Vietnam national legal database
- Global Solar Atlas – World Bank Group
- Vietnam Electricity (EVN)
This guide compiles reference information from legal documents and official sources; it is not legal advice. Technical and financial ranges are industry reference values — project decisions require a site-specific survey.
Need a solar plan for your plant?
Orca Energy surveys the roof, analyses the load profile, simulates yield and builds the financial case for all three routes: self-investment, ESCO and renewable purchase through DPPA.
0867 831 368•solar@orcaenergy.vn
Request a consultation