Solar for industrial parks: how to do it properly
Industrial parks
Manufacturers in industrial parks usually have large daytime load and customer-driven renewable targets, yet the roof they would use belongs to a landlord. This guide summarises the workable delivery models and the points to settle with the landlord before design starts.
In this guide
01
Three common delivery models
- The tenant invests directly on the roof it occupies and consumes all output on site.
- ESCO (zero-capex solar): an investor funds and installs the system and sells power below the grid tariff under a long-term contract.
- The park infrastructure owner invests on leased factory roofs and offers renewable power as a park utility.
- Buying renewable power through the DPPA mechanism when roof area cannot reach the renewable share a customer demands.
02
Points to settle with the roof and park owner
- Roof usage rights for the full contract term (usually longer than the current lease cycle).
- Responsibility for structure, waterproofing and handling roof repairs or sheet replacement.
- Asset treatment at lease end or relocation: removal, transfer or buy-out.
- Connection point, metering and rules for allocating output when park electrical infrastructure is shared.
These points are reference material for negotiation preparation and do not replace legal advice on a specific contract.
03
Permitting, safety and fire protection
Self-consumption rooftop solar follows Decree 58/2025/ND-CP together with guidance from the Ministry of Industry and Trade and EVN. Inside an industrial park, the documentation must also line up with the building's approved construction, environmental and fire protection files.
- Review the building's compliance on investment, construction, land, environment, electrical safety and fire protection.
- Complete the connection agreement and commissioning process with the utility.
- Design maintenance walkways, setbacks and rapid shutdown provisions for firefighting access on the roof.
- Update property and business interruption insurance after installation.
04
Linking to ESG targets and customer requirements
- Self-consumed solar output feeds scope 2 greenhouse gas inventory data.
- Where roof area is insufficient, combine DPPA renewable supply and I-REC certificates to raise the renewable share.
- Standardise metering data for ESG reporting and parent-company RE100 roadmaps.
- Add BESS when peak demand reduction or shifting load to high-tariff windows matters.
Frequently asked questions
Can a tenant install solar on a leased factory roof?
Yes, but it requires the landlord's written consent covering roof usage rights, structural and waterproofing responsibility and asset treatment at lease end; that consent is a prerequisite before design.
What if the roof cannot deliver a 100% renewable target?
The usual answer is a combination: maximise rooftop solar for self-consumption, then cover the remainder through the DPPA mechanism or renewable energy certificates, depending on customer requirements and current regulation.
What does an ESCO model commit the factory to?
The factory commits to buy on-site generation at the contracted price and term, so review minimum offtake, price adjustment, obligations during production shutdowns and system buy-out conditions carefully.
Related guides
Investment models
Zero-capex solar (ESCO): how the model works
How the solar ESCO model works: an investor funds the rooftop system, the company buys on-site power below the grid tariff. Eligibility, contract structure, risks and the clauses to negotiate.
Solar knowledge
Commercial rooftop solar in Vietnam: rules and delivery
A complete guide to industrial rooftop solar in Vietnam: self-production and self-consumption rules under Decree 58/2025/ND-CP, sizing against the load curve, realistic yields and the EPC delivery process.
Investment cost
How much does a 100 kWp solar system cost, and how fast does it pay back?
What goes into the cost of a 100 kWp rooftop solar system for a factory, how much energy it produces in Vietnam, how savings are calculated and which variables actually drive the payback period.
EPC services
Solar EPC: scope of work and how to select a contractor
What a solar EPC contractor delivers: the E–P–C scope, the process from survey to commissioning and O&M, selection criteria and the contract risks that matter most.
Sources
- Decree 58/2025/ND-CP on renewable energy development – Vietnam national legal database
- Ministry of Industry and Trade (moit.gov.vn)
- Vietnam Electricity (EVN)
This guide compiles reference information from legal documents and official sources; it is not legal advice. Technical and financial ranges are industry reference values — project decisions require a site-specific survey.
Need a solar plan for your plant?
Orca Energy surveys the roof, analyses the load profile, simulates yield and builds the financial case for all three routes: self-investment, ESCO and renewable purchase through DPPA.
0867 831 368•solar@orcaenergy.vn
Request a consultation